Concrete Volume Calculator - Metric

This Concrete Volume Calculator (Metric) is designed for continuous use: select an item, enter its dimensions, click Calculate, and watch the total roll into your project-no need to clear between entries. Each calculation appends to your history and instantly updates the Running Totals in m³ and yd³. Keep adding footings, walls, columns, pads, pillars or slabs until your entire job is logged. Want to start over? Just hit Clear History to reset both the list and all totals back to zero.

Available Options & Inputs
  • Footings - Length (m), Width (m), Depth (mm)
  • Foundation Walls - Length (m), Height (m), Thickness (mm)
  • Round Columns - Diameter (mm), Height (m)
  • Pads - Length (m), Width (m), Depth (mm)
  • Rectangle Pillars - Length (mm), Width (mm), Height (m)
  • Slabs - Length (m), Width (m), Thickness (mm)
  • Rectangular Pad & Column - Quantity (#), Column Length (mm), Column Width (mm), Column Height (m), Pad Length (m), Pad Width (m), Pad Depth (mm)
  • Circular Column & Square Pad - Quantity (#), Column Diameter (mm), Column Height (m), Square Pad Size (m), Pad Depth (mm)
  • Curb & Gutter - Length (m), Curb Depth (mm), Curb Height (mm), Gutter Width (mm), Flag Thickness (mm)

Concrete Calculator for Footings
Footings
Concrete Calculator for Walls
Walls
Concrete Calculator for Columns
Column
Concrete Calculator for Pads
Rectangle Pad
Concrete Calculator for Rectangular Post and Pad
Rectangle Post and Pad
Concrete Calculator for Slabs
Slabs
Rectangular Pad & Column Calculator
Rectangular Column & Pad
Circular Column & Square Pad Calculator
Circular Column & Square Pad
Curb and Gutter Calculator
Slabs

Concrete Volume Calculator

Make as many entries as needed;
history and running totals update in m³, and yd³.

Result for Current Item

Volume:

Volume:
yd³

Running Totals

Total m³:

Total yd³:
yd³

Calculation History



Calculator

  1. select the item type from the dropdown menu
  2. enter the required dimensions using metres and millimetres
Make as many entries as needed; history and running totals update in m³, and yd³.

Results

  1. the result will be displayed in m³ and yd³
  2. the history and running totals update automatically
  3. Use Reset to clear inputs or Clear History to reset totals and log.

Concrete Volume Formulas

Footings

\[ V_{\text{footing}} = L \times W \times D_{m}, \qquad D_{m} = \frac{D_{\text{mm}}}{1000} \]

Foundation Walls

\[ V_{\text{foundation}} = L \times H \times T_{m}, \qquad T_{m} = \frac{T_{\text{mm}}}{1000} \]

Round Columns

\[ V_{\text{column}} = \pi \left(\frac{D_{\text{mm}}}{2000}\right)^{2} \times H \]

Pads

\[ V_{\text{pad}} = L \times W \times D_{m}, \qquad D_{m} = \frac{D_{\text{mm}}}{1000} \]

Rectangle Pillars

\[ V_{\text{pillar}} = \frac{L_{\text{mm}}}{1000} \times \frac{W_{\text{mm}}}{1000} \times H \]

Slabs

\[ V_{\text{slab}} = L \times W \times T_{m}, \qquad T_{m} = \frac{T_{\text{mm}}}{1000} \]

Rectangular Pad & Column (n units)

\[ V_{\text{total}} = n \;\bigl(V_{\text{col}} + V_{\text{pad}}\bigr) \]

\[ V_{\text{col}} = L_{c,m}\,W_{c,m}\,H_{c}, \quad V_{\text{pad}} = L_{p}\,W_{p}\,D_{p,m} \]

\[ L_{c,m}= \frac{L_{c,\text{mm}}}{1000}, \; W_{c,m}= \frac{W_{c,\text{mm}}}{1000}, \; D_{p,m}= \frac{D_{p,\text{mm}}}{1000} \]

Circular Column & Square Pad (n units)

\[ V_{\text{total}} = n \;\bigl(V_{\text{col}} + V_{\text{pad}}\bigr) \]

\[ V_{\text{col}} = \pi\!\left(\frac{D_{\text{mm}}}{2000}\right)^{2}\!H, \quad V_{\text{pad}} = S^{2} \times D_{m}, \qquad D_{m} = \frac{D_{\text{mm}}}{1000} \]

Curb & Gutter

\[ A_{\text{curb}} = d_{m} \times h_{m}, \qquad A_{\text{flag}} = \bigl(d_{m}+w_{m}\bigr) \times t_{m} \]

\[ V_{\text{curb & gutter}} = \bigl(A_{\text{curb}} + A_{\text{flag}}\bigr) \times L \]

\[ d_{m} = \frac{d_{\text{mm}}}{1000},\; h_{m} = \frac{h_{\text{mm}}}{1000},\; w_{m} = \frac{w_{\text{mm}}}{1000},\; t_{m} = \frac{t_{\text{mm}}}{1000} \]

When Ordering Concrete

This concrete calculator will help you in estimating the amount of concrete needed for your project. The amount given as needed, does not include any waste. It is recommended, depending on the job you are doing, to add anywhere from an extra 4% to 10% to your concrete order to make sure you have enough concrete to finish the job. Ask when ordering the concrete. They will be able to give you a good idea of what is needed.