Spike's Calculators

Concrete Steps - Solid

Spike

Calculate the amount of concrete you need to pour solid concrete steps with no inside forming to reduce the amount of concrete. This calculator uses inches for measurements.

Concrete Stairs

Solid Concrete Steps

Number of Steps #
Rise in
Run in
Width of Stairs in
Total Rise in
Total Run in
Stair Slope °
Amount of concrete needed:
Cubic Feet ft³
Cubic Yards yd³
Cubic Meters

Calculation

  1. enter the number of steps
  2. the riser height of the step in inches
  3. the run of the step in inches
  4. the width of the stairs in feet and or inches

Results

  1. the total rise of the stairs in inches
  2. total run of the stairs in inches
  3. the slope of the stairs in degrees
  4. the amount of concrete needed in cubic feet
  5. the amount of concrete needed in cubic yards
  6. the amount of concrete needed in cubic metres

Conversions
one cubic inch (in³) = 0.000578703703703704 cubic feet (ft³)
one cubic inch (in³) = 0.0000214334705075445 cubic yards (yd³)
one cubic inch (in³) = 0.000016387064 cubic metres (m³)

To convert cubic feet to cubic yards multiply cubic feet * 0.037037037037037
To convert cubic feet to cubic metres multiply cubic feet * 0.028316846592
To convert cubic yards to cubic metres multiply cubic yards * 0.764554857984

When Ordering Concrete

This concrete calculator will help you in estimating the amount of concrete needed for your project. The amount given as needed, does not include any waste. It is recommended, depending on the job you are doing, to add anywhere from an extra 4% to 10% to your concrete order to make sure you have enough concrete to finish the job. Ask when ordering the concrete. They will be able to give you a good idea of what is needed.
If you have any questions or comments please Contact Us
Privacy Policy
© 1998, VmNet.